In its operations the Company applies state-of-the-art construction technologies.
Micro tunneling is performed with the Herrenknecht AG micro tunnel boring machines from Germany.
Pipelines are laid by horizontal directional drilling with the help of the Grundodrill andPrimedrillingrigs (Germany).
The policy of our Company seeks to implement latest technologies in trenchless pipe installation, for which purpose our members are consistently trained and upgrade their skills at TRACTO-TECHNIK GmbH & Co. KGinLennestadt (Germany).
AVN equipment from Herrenknecht. Modern trenchless pipe laying allows for piercing tunnels that can stretch as far as 350 meters and make interpass shafts needless.
Trenchless installation of 1000 mm pipesin different lengths up to 1000 m.
A hydrodynamic steerable bore rig for class 1, 2 and 3 soils. Trenchless laying of 300 mm pipes (mostly PE pipes), suitable for any pipe route up to 200 m (depending on soil class).
A hydrodynamic steerable bore rig for class 1, 2 and 3 soils (with accessory equipment of category 4 and above). Installation of 200 mm pipes for any pipe route up to 200 m (depending on soil class).
This microtunnel complex for trenchless steel pipeline crossings with a diameter up to 1380 mm and length up to 1500 m. is an ideal solution for gas and oil underground routes.
PrimeVerticaldrilling system enables an operator to drill inclined, horizontal and multihole wells with high performance and economic figures for natural resources development in any seam, even in those very close to the surface.
on the organizational and technical readiness of the organization to conduct work, issued by OOO Gazprom Gaznadzor